Post-construction window cleaning in Dallas-Fort Worth New glass, ready for the walkthrough.
Paint specks, stucco, labels, tape and a layer of construction dust: new glass is the dirtiest glass there is. Eco Cleaning Window Services does the first clean on new and remodeled buildings across Frisco, McKinney, Plano and Dallas, carefully enough not to scratch it.
What is included
What the first clean includes.
Post-construction cleaning is slow, careful work. This is what we check before calling a unit done.
- Labels and tapeManufacturer stickers and protective tape
- Paint and stucco specksRemoved with the correct blade and lubricant
- Construction dustGlass, frames, tracks and sills
- Window tracksVacuumed and wiped, not just the glass
- Interior and exterior glassEvery pane, both sides
- Final checkGlass looked at in daylight before we leave
Why it is different
Scraping new glass is where scratches happen.
Tempered and new glass can carry tiny fabrication debris on the surface. Drag a dry blade across it and the debris scratches a line that never comes out. Most post-construction damage happens this way, in the last step of the project.
We work wet, test a small corner first, change blades often and use the right angle for each kind of residue. It takes longer than a regular clean, which is why it is quoted per project.
Frisco and McKinney build more new retail and homes than almost anywhere in Texas, and every one of those buildings needs this first clean before anyone moves in.
How it works
From a photo to clean glass.
- Send a photo and the addressWhatsApp, the form or a call. A photo of the front tells us most of what we need.
- Get a range the same dayWe reply with a price range and a proposed time, and confirm on site before starting.
- We work around your hoursBefore opening, after close or on the day you choose, so customers never walk into wet floors.
- You get the glass back cleanFrames and sills included. If something on the list is not right, tell us and we come back.
Questions
What builders and owners ask us.
The first clean after building or remodeling: removing paint specks, stucco, mortar, labels, tape and construction dust from new glass and frames without scratching it.
Yes, if it is scraped wrong. New glass can carry fabrication debris that scratches under a blade, so we test a small area first and use the right blade, lubricant and angle.
After the last trade leaves and before the final walkthrough or move-in. Book a few days ahead so the date fits your schedule.
Yes. We clean new commercial units, offices and homes for builders, GCs and owners in Frisco, McKinney, Plano and the rest of DFW.
No. It takes longer because of the scraping and detail work, so it is quoted per project after seeing the site or photos.
★★★★★“Services are better than what I expected, the best commercial window cleaning in the Dallas - Fort Worth area.”
Send the project address and a few photos.
We quote per project and fit the date to your handover.